Monday, May 1, 2017

Week Four Outside Lab

This week we plan on starting to 3-D print our model. The specifications such as exact measurements and details are almost completed and we believe we can start printing in sections starting by the end of week five.

Design and measurements to be completed are for:

  • base
  • roof
  • columns
  • supports
  • ramps
  • stairs
  • length
  • height
  • width of walkway
  • designs
    • lights
    • plants
    • railings
    • glass
    • ramp material to reduce slip
    • drains for rainwater

No comments:

Post a Comment